网站你懂得_波多野结衣50连登视频_免费人成年激情视频在线观看_456亚洲影院_国产乱人对白A片_free性欧美人与dog_国产日产精品_国产精品毛片_啊灬啊灬快灬高潮了视频_亚洲色精品88色婷婷七月丁香_

山東艾賽文新材料科技有限公司更多內(nèi)容敬請(qǐng)關(guān)注!

新聞資訊
聯(lián)系我們

山東艾賽文新材料科技有限公司

聯(lián)系人: 周先生

手機(jī): 15106905678

電話: 15106905678

網(wǎng)址:m.dahuachengtao.com

郵箱: 948967999@QQ.com

地址: 山東濟(jì)南市天橋區(qū)無(wú)影山北路73-1號(hào)

新聞

新聞資訊

您現(xiàn)在的位置: 首頁(yè) > 新聞資訊

GRC構(gòu)件外墻板的特點(diǎn)

來(lái)源:http://m.dahuachengtao.com/ 發(fā)布人:admin 發(fā)布時(shí)間:2021-11-09

原材料規(guī)定
Raw material regulations
依據(jù)設(shè)計(jì)方案規(guī)定農(nóng)村基層狀況工程施工自然環(huán)境和時(shí)節(jié),挑選選購(gòu)工業(yè)涂料以及他配套原材料。
Select and purchase industrial coatings and other supporting raw materials according to the rural grass-roots conditions, natural environment and season of project construction specified in the design scheme.
關(guān)鍵機(jī)器:
Key machines:
①涂漆專(zhuān)用工具:排筆棕刷料桶等;
① Special tools for painting: brush barrel, etc;
②隆源噴涂機(jī)具:空壓機(jī)(大標(biāo)準(zhǔn)氣壓10Mpa,排氣管室0.6m3)
② Longyuan spraying equipment: air compressor (maximum standard air pressure 10MPa, exhaust pipe chamber 0.6m3)
髙壓無(wú)氣噴涂機(jī)(含配套設(shè)施機(jī)器設(shè)備);
High pressure airless spraying machine (including supporting facilities and equipment);
③噴斗噴漆槍液壓膠管等;
③ Spray bucket, spray gun, hydraulic hose, etc;
④滾漆專(zhuān)用工具:長(zhǎng)毛絨輥壓花輥服裝印花輥硬質(zhì)的塑膠或橡膠輥;
④ Special tools for paint rolling: Plush roller, embossing roller, garment printing roller, hard plastic or rubber roller;
⑤彈涂專(zhuān)用工具:手動(dòng)式或電動(dòng)式彈涂器及配套設(shè)施機(jī)器設(shè)備;
⑤ Special tools for elastic coating: manual or electric elastic coating device and supporting facilities, machinery and equipment;
⑥抹涂專(zhuān)用工具:不銹鋼板刮尺塑膠刮尺托灰板等;
⑥ Special tools for plastering: stainless steel plate scraper ruler, plastic scraper ruler, ash support plate, etc;
⑦便攜式電動(dòng)攪拌機(jī)等。
濟(jì)南GRC構(gòu)件
⑦ Portable electric mixer, etc.
作業(yè)環(huán)境:
Working environment:
①混泥土和墻壁抹抹灰砂漿之上的灰完成,且歷經(jīng)干躁,GRC預(yù)制構(gòu)件含水量應(yīng)合乎以下規(guī)定:
① The water content of GRC prefabricated components shall meet the following requirements after the concrete and wall plastering mortar are completed and dry:
表層施涂溶劑型涂料時(shí),含水量不可超過(guò)8%;
When applying solvent based coating on the surface, the water content shall not exceed 8%;
表層施涂水溶性和浮液建筑涂料時(shí),含水量不可超過(guò)10%。
When applying water-soluble and floating architectural coatings on the surface, the water content shall not exceed 10%.
②水電工程及機(jī)器設(shè)備頂墻壁預(yù)埋埋件完成。
② Completion of embedded parts on the top wall of hydropower projects and machinery and equipment.
③門(mén)窗制作完成并已施涂一遍功底油(油酯耐磨涂料),如選用機(jī)械設(shè)備噴漆建筑涂料時(shí),應(yīng)將不噴漆的位置遮住,防止環(huán)境污染。
③ Doors and windows have been fabricated and applied with one coat of power base oil (oil ester wear-resistant coating). If mechanical equipment is selected to spray architectural coating, the position that is not sprayed shall be covered to prevent environmental pollution.
④水溶性和保濕乳液建筑涂料施涂時(shí)的工作溫度,隆源GRC預(yù)制構(gòu)件應(yīng)按產(chǎn)品手冊(cè)的溫控。冬季房間內(nèi)施涂建筑涂料時(shí),應(yīng)在集中供暖標(biāo)準(zhǔn)下開(kāi)展,室內(nèi)溫度應(yīng)維持平衡,不可忽然轉(zhuǎn)變。
(4) the working temperature of water soluble and moisturizing emulsion building coating is controlled by the temperature control of Longyuan GRC prefabricated component according to the product manual. When applying architectural coatings in the room in winter, it shall be carried out under the central heating standard, and the indoor temperature shall be maintained in balance without sudden change.
標(biāo)準(zhǔn)是先弄之后先頂篷后墻壁。農(nóng)村基層→分分格縫→施涂機(jī)建筑涂料→噴滾彈主鍍層→噴滾彈整體面層建筑涂料→建筑涂料整修
The standard is to make it first, then the roof and then the wall. Rural base course solution → dividing and dividing joints → applicator architectural coating → main coating of roll coating → overall surface architectural coating of roll coating → architectural coating renovation
分格縫:先依據(jù)設(shè)計(jì)方案規(guī)定開(kāi)展吊豎直套方找老規(guī)矩彈分格縫。各項(xiàng)任務(wù)務(wù)必嚴(yán)苛按設(shè)計(jì)標(biāo)高操縱好,務(wù)必確保房屋建筑四周要交圈,也要考慮到隆源GRC內(nèi)墻涂料工程項(xiàng)目分段進(jìn)行時(shí),應(yīng)以分格縫墻的陰角線處或水落管等為交界線和沉降縫,豎直分格縫則務(wù)必開(kāi)展吊直,干萬(wàn)不能用尺量,不然差2mm亦會(huì)很顯著,縫格務(wù)必是豎直光潔大小一致等
Dividing joint: firstly, according to the provisions of the design scheme, hang the vertical sleeve, find the old rules and snap the dividing joint. All tasks must be strictly controlled according to the design elevation, and it must be ensured that the surrounding of the house building should be crossed. It should also be considered that when the Longyuan GRC interior wall coating project is carried out in sections, the internal corner line of the dividing joint wall or the downpipe should be taken as the boundary and settlement joint, and the vertical dividing joint must be lifted straight. It can not be measured with a ruler, otherwise the difference of 2mm will be significant, The seam grid must be vertical, smooth, uniform in size, etc
相關(guān)新聞
相關(guān)產(chǎn)品